Submittals / 01

Prepare every submission with clear requirements

Create the submittal with discipline, specification, owner and required date. Teams know from the start what to submit and when.

4 minutes
edificio-torre-principal-v3.rvtRVT • MODELO TÉCNICO×{3D}LEFTedificio-torre-principal-v3.rvt · 48.3 MB · Subido 14 Mar 2025AUTODESK FORGE VIEWER
Video coming soon
In this guide

What you'll learn

01

How prepare every submission with clear requirements works inside Perfour.

02

What information you need and how it stays connected to Submittals.

03

How to preserve traceability and find the record later.

Step by step

How to complete submittal creation

  1. 01

    Understand the objective

    A submittal is the formal submission of materials, technical data, shop drawings, samples or other documentation for review and approval before procurement, fabrication or installation. This guide focuses on prepare every submission with clear requirements.

  2. 02

    Prepare submittal creation

    Enter title, type, specification section, description, related drawing, owner and response due date. Attach the technical package and select reviewers and distribution participants.

  3. 03

    Complete the workflow in Perfour

    Create the record, request submission or send it for approval, receive a formal response, correct it through a new revision when needed, and close or void it with a reason. Type, specification, owner and date define what must be submitted.

  4. 04

    Review relationships and traceability

    The submittal can link drawings and files and provide context to quality, RFIs and schedule. The approved revision becomes the reference for procurement and execution. Do not combine unrelated products when they require independent decisions. Confirm the response applies to the correct revision and the field uses only the approved version.

FAQ

Frequently asked questions

What is submittal creation and what is it for?+

A submittal is the formal submission of materials, technical data, shop drawings, samples or other documentation for review and approval before procurement, fabrication or installation.

What information do I need to prepare every submission with clear requirements?+

Enter title, type, specification section, description, related drawing, owner and response due date. Attach the technical package and select reviewers and distribution participants.

How is this process completed in Perfour?+

Create the record, request submission or send it for approval, receive a formal response, correct it through a new revision when needed, and close or void it with a reason. Type, specification, owner and date define what must be submitted.

Which other modules does it connect with?+

The submittal can link drawings and files and provide context to quality, RFIs and schedule. The approved revision becomes the reference for procurement and execution.

What should I check before considering it complete?+

Do not combine unrelated products when they require independent decisions. Confirm the response applies to the correct revision and the field uses only the approved version.