Inspect directly from the field
Run pass/fail checks where the work happens. Simple capture means more gets recorded with less later transcription.
What you'll learn
How inspect directly from the field works inside Perfour.
What information you need and how it stays connected to Quality.
How to preserve traceability and find the record later.
How to complete field inspection
- 01
Understand the objective
Quality control verifies that work meets defined criteria. In Perfour an inspection contains checks; a failed result can open a nonconformity until corrective work is completed and verified. This guide focuses on inspect directly from the field.
- 02
Prepare field inspection
Define name, category, priority, due date and assignments as executor, verifier or observer. Add check items, criteria, status, evidence and links to a drawing, task, submittal, RFI or file.
- 03
Complete the workflow in Perfour
Create from a template or new inspection, mark each check pending, OK, not OK or not applicable, attach evidence and submit for review. If it fails, open the nonconformity and verify closure. Mobile inspection records the result where it is observed.
- 04
Review relationships and traceability
Inspections connect with drawings, tasks, RFIs, submittals, files and Daily Logs. This locates the finding and connects corrective action with execution. Criteria must be verifiable and evidence legible. Separate executor and verifier when risk requires it, and do not close a nonconformity without checking the correction.
Frequently asked questions
What is field inspection and what is it for?+
Quality control verifies that work meets defined criteria. In Perfour an inspection contains checks; a failed result can open a nonconformity until corrective work is completed and verified.
What information do I need to inspect directly from the field?+
Define name, category, priority, due date and assignments as executor, verifier or observer. Add check items, criteria, status, evidence and links to a drawing, task, submittal, RFI or file.
How is this process completed in Perfour?+
Create from a template or new inspection, mark each check pending, OK, not OK or not applicable, attach evidence and submit for review. If it fails, open the nonconformity and verify closure. Mobile inspection records the result where it is observed.
Which other modules does it connect with?+
Inspections connect with drawings, tasks, RFIs, submittals, files and Daily Logs. This locates the finding and connects corrective action with execution.
What should I check before considering it complete?+
Criteria must be verifiable and evidence legible. Separate executor and verifier when risk requires it, and do not close a nonconformity without checking the correction.