Quality / 04

Turn failures into accountable nonconformities

When a check fails, create a nonconformity with owner, priority and due date. The issue enters a formal process until resolved.

4 minutes
Quality Control / Non-Conformities
Concrete cover inspection
Assigned to Maria Garcia
Passed
Welding point revision
Assigned to Carlos Lopez
Pending
Verticality wall A3
Assigned to Roberto Mendez
Failed
Mechanical room checklist
Assigned to Ana Prieto
Passed
Video coming soon
In this guide

What you'll learn

01

How turn failures into accountable nonconformities works inside Perfour.

02

What information you need and how it stays connected to Quality.

03

How to preserve traceability and find the record later.

Step by step

How to complete nonconformity

  1. 01

    Understand the objective

    Quality control verifies that work meets defined criteria. In Perfour an inspection contains checks; a failed result can open a nonconformity until corrective work is completed and verified. This guide focuses on turn failures into accountable nonconformities.

  2. 02

    Prepare nonconformity

    Define name, category, priority, due date and assignments as executor, verifier or observer. Add check items, criteria, status, evidence and links to a drawing, task, submittal, RFI or file.

  3. 03

    Complete the workflow in Perfour

    Create from a template or new inspection, mark each check pending, OK, not OK or not applicable, attach evidence and submit for review. If it fails, open the nonconformity and verify closure. A failed result opens an issue with an owner and due date.

  4. 04

    Review relationships and traceability

    Inspections connect with drawings, tasks, RFIs, submittals, files and Daily Logs. This locates the finding and connects corrective action with execution. Criteria must be verifiable and evidence legible. Separate executor and verifier when risk requires it, and do not close a nonconformity without checking the correction.

FAQ

Frequently asked questions

What is nonconformity and what is it for?+

Quality control verifies that work meets defined criteria. In Perfour an inspection contains checks; a failed result can open a nonconformity until corrective work is completed and verified.

What information do I need to turn failures into accountable nonconformities?+

Define name, category, priority, due date and assignments as executor, verifier or observer. Add check items, criteria, status, evidence and links to a drawing, task, submittal, RFI or file.

How is this process completed in Perfour?+

Create from a template or new inspection, mark each check pending, OK, not OK or not applicable, attach evidence and submit for review. If it fails, open the nonconformity and verify closure. A failed result opens an issue with an owner and due date.

Which other modules does it connect with?+

Inspections connect with drawings, tasks, RFIs, submittals, files and Daily Logs. This locates the finding and connects corrective action with execution.

What should I check before considering it complete?+

Criteria must be verifiable and evidence legible. Separate executor and verifier when risk requires it, and do not close a nonconformity without checking the correction.