Submittals / 05

Preserve versions and resubmissions

When a submission returns with comments, create the next revision without erasing the prior one. The full sequence remains available for audit.

7 minutes
edificio-torre-principal-v3.rvtRVT • MODELO TÉCNICO×{3D}LEFTedificio-torre-principal-v3.rvt · 48.3 MB · Subido 14 Mar 2025AUTODESK FORGE VIEWER
Video coming soon
In this guide

What you'll learn

01

How preserve versions and resubmissions works inside Perfour.

02

What information you need and how it stays connected to Submittals.

03

How to preserve traceability and find the record later.

Step by step

How to complete version history

  1. 01

    Understand the objective

    A submittal is the formal submission of materials, technical data, shop drawings, samples or other documentation for review and approval before procurement, fabrication or installation. This guide focuses on preserve versions and resubmissions.

  2. 02

    Prepare version history

    Enter title, type, specification section, description, related drawing, owner and response due date. Attach the technical package and select reviewers and distribution participants.

  3. 03

    Complete the workflow in Perfour

    Create the record, request submission or send it for approval, receive a formal response, correct it through a new revision when needed, and close or void it with a reason. Each resubmission creates a revision without erasing the prior one.

  4. 04

    Review relationships and traceability

    The submittal can link drawings and files and provide context to quality, RFIs and schedule. The approved revision becomes the reference for procurement and execution. Do not combine unrelated products when they require independent decisions. Confirm the response applies to the correct revision and the field uses only the approved version.

FAQ

Frequently asked questions

What is version history and what is it for?+

A submittal is the formal submission of materials, technical data, shop drawings, samples or other documentation for review and approval before procurement, fabrication or installation.

What information do I need to preserve versions and resubmissions?+

Enter title, type, specification section, description, related drawing, owner and response due date. Attach the technical package and select reviewers and distribution participants.

How is this process completed in Perfour?+

Create the record, request submission or send it for approval, receive a formal response, correct it through a new revision when needed, and close or void it with a reason. Each resubmission creates a revision without erasing the prior one.

Which other modules does it connect with?+

The submittal can link drawings and files and provide context to quality, RFIs and schedule. The approved revision becomes the reference for procurement and execution.

What should I check before considering it complete?+

Do not combine unrelated products when they require independent decisions. Confirm the response applies to the correct revision and the field uses only the approved version.