Assign machinery to the right job
Move equipment between base and projects while keeping each asset's location and assignment visible.
What you'll learn
How assign machinery to the right job works inside Perfour.
What information you need and how it stays connected to Equipment & Machinery.
How to preserve traceability and find the record later.
How to complete equipment assignment
- 01
Understand the objective
Equipment manages physical assets, location, assignment, availability and maintenance from one shared record. This guide focuses on assign machinery to the right job.
- 02
Prepare equipment assignment
Record identification, category, status, base location and operating data. For assignments or maintenance, add project, dates, owner, notes and result.
- 03
Complete the workflow in Perfour
Create and configure the asset, assign it to a base or project, and update its plan. When intervention is required, open and complete the corresponding work order. Assignment shows which project uses the equipment.
- 04
Review relationships and traceability
Equipment can be reviewed globally, by organization and by project; planning and location keep office and field coordinated. Confirm identity, location and status before reassignment. Do not close a work order without documenting the intervention and result.
Frequently asked questions
What is equipment assignment and what is it for?+
Equipment manages physical assets, location, assignment, availability and maintenance from one shared record.
What information do I need to assign machinery to the right job?+
Record identification, category, status, base location and operating data. For assignments or maintenance, add project, dates, owner, notes and result.
How is this process completed in Perfour?+
Create and configure the asset, assign it to a base or project, and update its plan. When intervention is required, open and complete the corresponding work order. Assignment shows which project uses the equipment.
Which other modules does it connect with?+
Equipment can be reviewed globally, by organization and by project; planning and location keep office and field coordinated.
What should I check before considering it complete?+
Confirm identity, location and status before reassignment. Do not close a work order without documenting the intervention and result.