Manage maintenance with work orders
Create and complete maintenance work so the repair, owner and result remain attached to the asset.
What you'll learn
How manage maintenance with work orders works inside Perfour.
What information you need and how it stays connected to Equipment & Machinery.
How to preserve traceability and find the record later.
How to complete work orders
- 01
Understand the objective
Equipment manages physical assets, location, assignment, availability and maintenance from one shared record. This guide focuses on manage maintenance with work orders.
- 02
Prepare work orders
Record identification, category, status, base location and operating data. For assignments or maintenance, add project, dates, owner, notes and result.
- 03
Complete the workflow in Perfour
Create and configure the asset, assign it to a base or project, and update its plan. When intervention is required, open and complete the corresponding work order. Work orders preserve completed maintenance.
- 04
Review relationships and traceability
Equipment can be reviewed globally, by organization and by project; planning and location keep office and field coordinated. Confirm identity, location and status before reassignment. Do not close a work order without documenting the intervention and result.
Frequently asked questions
What is work orders and what is it for?+
Equipment manages physical assets, location, assignment, availability and maintenance from one shared record.
What information do I need to manage maintenance with work orders?+
Record identification, category, status, base location and operating data. For assignments or maintenance, add project, dates, owner, notes and result.
How is this process completed in Perfour?+
Create and configure the asset, assign it to a base or project, and update its plan. When intervention is required, open and complete the corresponding work order. Work orders preserve completed maintenance.
Which other modules does it connect with?+
Equipment can be reviewed globally, by organization and by project; planning and location keep office and field coordinated.
What should I check before considering it complete?+
Confirm identity, location and status before reassignment. Do not close a work order without documenting the intervention and result.