Define usage rates and costs
Preserve operating rates for each asset so planning and finance work from the same reference.
What you'll learn
How define usage rates and costs works inside Perfour.
What information you need and how it stays connected to Equipment & Machinery.
How to preserve traceability and find the record later.
How to complete equipment rates
- 01
Understand the objective
Equipment manages physical assets, location, assignment, availability and maintenance from one shared record. This guide focuses on define usage rates and costs.
- 02
Prepare equipment rates
Record identification, category, status, base location and operating data. For assignments or maintenance, add project, dates, owner, notes and result.
- 03
Complete the workflow in Perfour
Create and configure the asset, assign it to a base or project, and update its plan. When intervention is required, open and complete the corresponding work order. Rates provide a shared usage reference.
- 04
Review relationships and traceability
Equipment can be reviewed globally, by organization and by project; planning and location keep office and field coordinated. Confirm identity, location and status before reassignment. Do not close a work order without documenting the intervention and result.
Frequently asked questions
What is equipment rates and what is it for?+
Equipment manages physical assets, location, assignment, availability and maintenance from one shared record.
What information do I need to define usage rates and costs?+
Record identification, category, status, base location and operating data. For assignments or maintenance, add project, dates, owner, notes and result.
How is this process completed in Perfour?+
Create and configure the asset, assign it to a base or project, and update its plan. When intervention is required, open and complete the corresponding work order. Rates provide a shared usage reference.
Which other modules does it connect with?+
Equipment can be reviewed globally, by organization and by project; planning and location keep office and field coordinated.
What should I check before considering it complete?+
Confirm identity, location and status before reassignment. Do not close a work order without documenting the intervention and result.